• de
  • en
You are here: Home > Company > Company history
CONTACT US!
Phone:
+49 (0)3644 5058-0

Fax:
+49 (0)3644 5058-99

e-mail:
contact(at)acu-pharma.com
LATEST NEWS

Recertification according to Council Regulation (EC) No 834/2007 (BIO certificate)

Establishment of further storage facility (540 m²)

Implementation of an operating data logging and measurement data acquisition

Certification of an energy efficiency system

Restructuring the hall exterior and roof of the warehouse

Online launch of our new company website after extensive redesign

Renewal of the fire alarm system

Implementation of a new ERP system

Successful Bio Certification

Conversion of the plant control system

QUALITY MANAGEMENT


Company history


2016 Acquisition of the business of Delfino Pharma & Chemie AG

Brenntag Group, the global market leader in chemical distribution, has taken over the ACU shares
 
2015 20th company anniversary

Certification of an energy efficiency system

Implementation of an operating data logging and measurement data acquisition

Establishment of further storage facility (540 m²)
 
2014 Extensive redesign of our company website

Renewal of the fire alarm system

Restructuring the hall exterior and roof of the warehouse
   
2013 Implementation of a new ERP system

Building up a HACCP-compliant cryogenic grinding system
made of stainless steel. This is a Pin Mill GSM 250, which can be operated in three different modes:
  • Cryogenic grinding with liquid nitrogen
  • Inert with gaseous nitrogen (protective gas atmosphere)
  • Standard mode with specially processed compressed air
If necessary, sieving can be carried out subsequently to the grinding process, in order to produce defined fractions.
   
2012 Successful Bio Certification
   
2011 Conversion of the plant control from SP 5 to SP 7 concerning the plants 100 AFG, 200 AFG, 400 AFG and 315 ZPS

Installation of new rotary valves in above mentioned plants according to hygienic design directives

Construction of a new filling line (facilities included) consisting of a filling and dosage machine (Mac-Microdos-Duostep) for open mouth bags in combination with various eligible sewing machines (double stitched seam sewing-unit, adhesive asset, heatseal-system)
 
2010

Due to a great order situation ten new employees could be hired.

New investments in oil-free compressor systems and usage of oil-free compressed air in the whole production site

The compressed air pipeline system is completely made of stainless steel.

Major overhaul of the Jet Mills

   
2009 Through expansionary investments now several plants can optionally be operated with compressed air or under inert gas atmosphere (nitrogen, protective gas atmosphere).
   
2008 Creation of a new Quality Assurance department under whose direction the laboratory could be essentially extended
   
2007 Installation of high-quality scales directly under the plants
   
2006 Creation of separate filling and storage areas by partition within the production buildings
   
2005

In August the HACCP concept was introduced and certified by DQS for the first time.
Furthermore we have created separate rooms for the manufacturing plants in another building to provide an easy construction and exchange of different plants. This way we achieved a greater flexibility and product safety.

   
2004 In February our Quality Management System was certified by DQS according to ISO 9001 for the first time.
   
2003 Creation of separate rooms according to HACCP for all manufacturing plants in our main building to prevent cross-contamination
   
2001 Soil sealing of the access roads and commencement of the modernization of a further building
   
1999

Start of the Business Units PHARMA/ food/ cosmetic

   
1996 Start of the Business Unit CHEMISTRY
   
1995 Company establishment



Request additional information... Contact us...




ACU PHARMA und CHEMIE GmbH
Am tiefen Graben 6, DE-99510 Apolda
Phone: +49 (0)3644 5058-0
Fax:     +49 (0)3644 5058-99
www.acu-pharma.com
contact(at)acu-pharma.com